A Six-Year Pellet Plant Expands in Eastern China

From roughly 5 t/h across two legacy machines to stable output near 8 t/h on one machine.

Project Overview

  • Client: an anonymized biomass energy company in Eastern China
  • Industry: biomass pellet production · power-plant fuel supply
  • Plant established: 2020
  • Equipment: CY-P1000 Enhanced + one-year extended warranty
  • Commissioned: Q2 2026

Customer Challenges

  • Two legacy machines delivered roughly 5 t/h combined and could not meet growing demand.
  • Frequent failures raised maintenance cost and downtime losses.
  • Power-plant customers required more consistent supply and more reliable equipment.

Selection Process

  • The client compared five industrial pellet-mill suppliers.
  • Key criteria: continuous-operation stability, wear-part life, service response and price transparency.
  • The client selected P1000 Enhanced: its 7–9 t/h range matched the expansion target, with transparent configuration tiers and published pricing.

Delivery and Commissioning

  • Online configuration → schedule lock-in → manufacturing → factory inspection → on-site installation and commissioning.
  • Two days of operator training plus two days of maintenance training covered the workshop and maintenance teams.
  • The standard intelligent control system reduced the operating learning curve.

Operating Results

7.5–8 t/hStable actual output; published Enhanced range: 7–9 t/h
Significantly improvedEquipment uptime compared with the legacy machines
Further optimization possiblePower consumption per ton versus the legacy equipment
Within expectationsRing-die and roller wear remained within the expected service-life range

Customer Comment

“Published pricing and configurations made comparison straightforward. In operation, stability improved substantially over the old machines. Less maintenance downtime naturally raised output. We will also consider P1100 for the next expansion.”
— Client Production Manager

Which Machine Fits Your Plant?

Use the configurator to enter operating requirements, then send an inquiry to confirm the project.